Refrigerated Warehouse Costs: Comparing Solutions in Hong Kong

Issue: Update: Classification: Author: Kam Hing Engineering
Hong Kong refrigerated warehouse engineering cost comparison - large refrigerated warehouse cost structure
Summary of focus
  • Large-scale refrigerated warehouse and refrigerated warehouses in this Focus are suitable for logistics companies, wholesalers, importers and exporters, food plants and pharmaceutical warehousing.
  • The cost of large refrigerated warehouses is not only by area, with significant impact on the number of floors, terminals, temperature areas, cold room door and loading areas.
  • The cost-company comparison programme for each plate is often more objective than the chicken price.
  • The costs of large refrigerated warehouses are often underestimated by the refrigeration, floor defence and backwilling, electricity supply, firefighting and monitoring.
  • Self-build and rented third-party cold warehousing has advantages and disadvantages, which should be judged on the stability of the quantity of goods and the length of their use.

Preamble: Why is it difficult to say why refrigerated warehouse prices?

Similarly, ⁇ refrigerated warehouse plutonium, a single warehousing warehouse with frozen meat, and a logistics refrigeration, loading and unloading area and multi-tunnel fast valves at a very different cost. The price of the refrigerated warehouse depends on storage capacity, access pattern, temperature area, reliability requirements and site conditions, not just size.

This paper will dismantle the cost structure of large refrigerated warehouses and provide a more programmatic approach to assist you in making reasonable budgetary judgements before investing in the refrigerated warehouse. If you plan the cafeteria walk-in cold room or small chilled room, please seeHong Kong cold room price point for work。

refrigerated warehouses and generalcold room, respectively

ItemGeneralcold room/walk-in cold roomrefrigerated warehouse/refrigerated warehouse
SizeSmall to mediumMedium to large
Modalities of removalHands, handcuffsForklift, plate
StorageStorageStorage, multi-layer panels
Frequency of accessSecondaryHigh, permanent loading and unloading area
Wind areasSingle or bizonalFrequent multi-temperature zones
ReliabilitySingle refrigeration unit commonMultirefrigeration unit readiness assistance is often considered
MonitoringWind controllersMulti-point temperature monitoring and records

The technical elements of refrigerated warehouse are available on the service pageRefrigerated Warehouse EngineeringandFull guidance for refrigerated warehouse engineering in Hong Kong。

Large refrigerated warehouse cost structure

Cost categoryMain contentImpact factors
thermal insulation reservoirWallboards, ceilings, spacing walls, sealed harvestsNumber of areas, floors, temperatures and temperate areas
floorfloorthermal insulation, non-frozen, heavy layerTemperature, forklift and cargo load
cold room door and handlingFast gates, tractors, winds, loading and unloading areasGate, gate size, frequency of access
Refrigeration systemrefrigeration unit, rollerator, pipeline, controlHeat load, temperate zone, request for assistance
ElectricityElectricity applications, distributions, cablesTotal power, available electricity
MonitoringMulti-point temperature records, alerts, remote monitoringMonitoring points, compliance requirements
Fire and buildingAccompaniment of relevant regulationsUse of buildings and firefighting requirements
Construction and managementTransport, cooking, project management, testingSite, duration, phased requirements
The proportion of the total cost per component varies from project to project, with no fixed percentage. For example, frequent and multi-door logistics refrigeration of access, high rates of cold room door and handling; Drug warehouses for refrigeration assistance are required and the proportion of refrigeration systems is higher.

Capability, floor and cargo mounting: decision storage capacity

The storage capacity of large refrigerated warehouses depends on the availability of high latitudes and not just areas. The same area of warehouses, where the floor is relatively high, can set up additional layers and store more containers.

  • Available floor:Deduction of space required for the thickness, seppers, lighting and firefighting facilities
  • Type of crane:Selective bands to facilitate access; Storage density of dense cargo mounds is high, but less flexible access
  • Breadth of access:With regard to the type of forklift, the greater access and the lower density of storage
  • Customary flows:Preservation of space between cargo roofs and hairs to cover the entire warehouse

The size of the panels insulated includes walls and flowers. The higher the floor, the greater the wall area and the cost of thermal insulation would increase, but the cost per cubic metre would normally be reduced. The planning should therefore take into account both the size and the altitude.

Comparison programme at cost per floor

Different programmes have different sizes, altitudes and crane designs, and the price of each square blanket is easily lost. A more objective approach is to compare the cost of each plate:

Cost per terminal engineering = total cost of refrigerated warehouse engineering

For example, programme A has a sizeable but high floor and more cargo craft; Programme B has a large area but only a smaller layer of craft. The total price of both may be similar, but the cost of each plate can be very remote.

Common plate size includes 1.2m ⁇ 1.0m and 1.2m ⁇ 0.8m. The plan will be calculated on the basis of the actual usage of the floor size, the height and weight of the goods.

Impact of temperate planning on costs

Wind areasGeneral temperatureCost characteristics
Refrigeration areaApproximately 0°C to +10°Cthermal insulation and lower requirements for refrigeration
Refrigeration zoneApproximately -18°C to -25°Cthermal insulation is thick, requiring floor defence, gate heating, electrification, etc.
EmergenciesApproximately - 30°C or belowthermal insulation of the thickest, most refrigerant
Discharged area/ buffer zoneDepending on needsDirect access to external environment in less refrigeration zones

Each temperate area requires additional walls, spacing, refrigeration systems or sub-sector control and increased costs. Planning should be based on the type and proportion of the goods, avoiding the establishment of temperate zones.

cold room door and loading areas

The entrance to refrigerated warehouse is often the highest chiller erosion. The number, size and type of cold room directly affect engineering fees and future electricity costs.

  • Fast door:Shortened opening hours suitable for frequent access
  • Lacold room gate:The sealing is good and suitable for less accessible locations
  • Storm/ rubber:As a complement to reduce refrigeration loss at the start of the gate
  • Discharge zone:Establishment of buffer zones or temperature-controlled loading and unloading areas to reduce the time spent on cargo staying in constant temperatures
  • Impact protection:The doorbox and insulated next to the gate should be reinforced with a collision fencing

Cold room door options can be consultedInsulation Work and Cold Room Materials。

Refrigeration system and support

Refrigeration

The refrigerated warehouse is refrigerated to calculate the heat loads of thermal insulation infiltration, cargo entry bank, opening, lighting, forklift and personnel. The volume of refrigeration is increased accordingly in warehouses with large quantities of incoming goods and high temperatures in the reservoir.

Assistance

  • Single large system:Initial costs are lower, but once the failures occur, the whole temperate zone will be affected
  • Dorefrigeration unit parallel:The remaining refrigeration unit is still able to maintain basic temperatures at the time of a set of malfunctions; Part refrigeration unit may also be opened at low payloads

The higher the value of the goods, and the greater the risk of parking need to be taken into account. Comparability of refrigerationSingle vs multimedia and onlineandrefrigerant option。

floor: Frozen and underwriting

refrigerated warehouse floor addresses two issues simultaneously:

  1. Freezing:Long-term sporadic operations, with a possible ice flashion under the floor, resulting in unfrozen inflation and a break-up of the floor. refrigerated warehouse typically requires floorthermal insulation and, as appropriate, additional protection measures.
  2. Subject matter:The floor is to bear the load of forklifts and mounts, and thermal insulation layers and surface layers will have sufficient resistance. The building ' s warehouse is also required to confirm the load of the building.
Once the floor problem arises, repairs often need to be cleared of warehouses, and costs and terminal losses are significant. The floor design should be determined at an early stage of planning and should not be streamlined to save costs.

Electricity supply

  • Large-scale refrigeration unit, lighting, heat components and fast gates of the warehouse will bring larger demand for electricity
  • If the existing power supply is inadequate, it may be necessary to apply for an increase in the electricity supply to the Electricity Company, taking into account the project schedule well in advance
  • The distribution design takes into account multirefrigeration unit and reserve assistance
  • Fixed power installations are generally to be performed by registered electrical engineering staff employed by Registered Electrical Contractor

Firefighting and building regulations

  • Storage alterations or new refrigerated warehouses are required to meet the relevant requirements of the Fire Service for building purposes
  • Changes related to building structures, channels or outer walls are subject to the relevant system of Buildings Department
  • Insulated panels ' materials, fire resistance should be selected in conjunction with the project fire requirements
  • If a designated food is stored for commercial purposes, it must be understood that the EDA will have to do so.freezer room licenceRequest
The above is general, not legal or professional. The actual requirements are based on the latest release of the Fire Service, Buildings Department, Electrical and Mechanical Services Department and ISA, and large-scale project proposal consultants.

Temperature surveillance and records

The temperature distribution of large refrigerated warehouses is not necessarily rampant and requires multiple inspections. Common configurations include:

  • Multiple temperature sensors covering high low position and near gate
  • Sustained recording and maintenance of temperature data
  • Over temperature warnings and notification to the designated person
  • Telescope temperature and refrigeration unit state
  • Fixed school temperature sensors

Operational costs: beyond engineering fees

Operating costsImpact factorsControl methods
Electricitythermal insulation quality, opening frequencies, refrigeration unit efficiency, temperature creationthermal insulation and sealing, use of fast gates for regular maintenance
Maintenancerefrigeration unit quantity and system complexityEstablishment of periodiccold room maintenancePlanned
MaintenanceStatus of equipment, duration of useEarly handling of small issues and avoidance of major repairs
Loss of parkingValue of goods, provision of assistanceRefrigeration and super temperature alert

The methods for estimating electricity costs are available.Total cost-comparability comparison programme。

Auto-build refrigerated warehouse vs rented warehousing

ComparisonSelf-buildingrefrigerated warehouseRental of third-party cold warehousing
Prior-period investmentsLargeLower
Long-term costsElectricity, maintenance and controlOngoing expenditure on rental and service costs
Design flexibilityDesignable according to their own goods and processesSubject to existing conditions in warehouses
Resilient of scaleIncreased need for reinvestmentIncreased and reduced space as required
ManagementNeed for self-management and maintenanceHandled by operator
EligibleStable quantity, long-term use and special requirementsLarge volume fluctuations, short-term or trial

Sub-investment strategy

In the event that business is still expanding, it may be considered to build in stages:

  1. Overall planning:Planning of layouts, electrical power, refrigeration unit location and floor at the end began.
  2. Initial construction:Construction of immediate temperate areas and capacity.
  3. Extension:Electricity capacity, routing location and the expansion of walls will be set aside to facilitate future expansion.
  4. Upgrading as required:An additional refrigeration unit was built after the operational growth.

The combinationinsulated panels are extended after a convenience period, but they remain to be receptive at the time of their first design so as not to be significantly altered.

Comparative refrigerated warehouse engineering quotations

  • Total capacity and number of available plates
  • Temperature and thickness of panels in temperature zones
  • floorthermal insulation, non-frozen and heavy practices
  • cold room door quantity, type and size
  • refrigeration unit configuration, refrigerant and reserve assistance
  • Scope of electrical engineering
  • Thermometers and functions
  • Scoping period and phased arrangements
  • Maintenance and periodic maintenance

More comparing methods can be consultedDetailed comparison between refrigeration Engineering, Hong KongandDetailed comparative analysis by refrigerated warehouse engineering company, Hong Kong。

Common issues

refrigerated warehouse engineering fees should be comparable in size or capacity?

The storage capacity of large refrigerated warehouses is dependent on the base floor and the number of building blocks available. At the time of the ICP, reference could be made to both volumes and number of plates, using cloud per floor cost as a more objective benchmark. For further detailsCost per plate。

What are the costs of refrigerated warehouses spent primarily?

The main components include thermal insulation treasury and floor, cold room door and handling areas, refrigeration systems and reserves, electricity, temperature monitoring, firefighting and building attachments, as well as construction and project management. The proportion of each component is subject to the project. For further detailsCost structure。

Would the self-building refrigerated warehouse be compared with the rental of third-party cold wars?

(b) Investments in the pre-establishment period are high, but long-term costs are more manageable and designed to be flexible; Pre-lease investments were low and flexible, but the rent was sustained. The annual comparison shall be based on the stability of the quantity of goods and their use. For further detailsSelf-building vs rented。

Would the refrigerated warehouse floor be very specific?

The refrigerated warehouse is chronically under zero, and the water sub-floor may cause unfrozen inflation and the floor will have to bear the weight of forklifts and mounts, thus requiring thermal insulation, protection and adequate backwill design. For further detailsfloor。

Would large refrigerated warehouse require refrigeration?

The refrigerated warehouse, where large or high-value goods are stored, can be significantly lost. Multiple groups of refrigeration unit are common standby practices that should be assessed in conjunction with the value of goods and terminal risks. For further detailsRefrigeration system and support。

Summary

The price of large refrigerated warehouse depends on storage capacity, temperature area, access pattern, reliability requirements and site conditions. The early processing of items that are vulnerable to underestimation, such as floors, electricity, firefighting and inspection, with a more accurate planning of the warehouse engineering budget for refrigerated, taking into account phased investment in business development, is carried out through a cost-comparel comparison programme.

Kam Hing Engineering and Trading Co. Limited is professionally engaged in various types of large-scale cold room, thermal insulation and maintenance works, including large pharmaceutical warehousing, logistics warehouses, Wine cellar and food refrigerated warehouses, providing one-stop services for project design, procurement, installation, periodic inspection and maintenance. More:About us|Services|Our clients。

Extended reading

Planning refrigerated warehouse or refrigerated warehouse? Consultations with Kam Hing Engineering

We can assist in assessing the refrigerated warehouse layout, refrigeration configuration and budget, as well as provide a detailed refrigerated warehouse engineering offer, according to your quantity, temperature area and access process.

Address: Telephone, 3rd Floor, Tuen Mun Launch Street, New Triangle Industrial Centre: 2443 4221 e-mail kamhing.engineering@yahoo.com

WhatsApp